冷再生技術(shù)質(zhì)量檢查程序是什么?
來(lái)源:http://www.bystreet.cn/ 日期:2021-04-12
  冷再生技術(shù)質(zhì)量檢查程序的質(zhì)量體系要結(jié)合工程施工的進(jìn)行順序、進(jìn)展情況及時(shí)、有效地開展工作。
  The quality system of cold recycling technology quality inspection procedure should be carried out timely and effectively in combination with the construction sequence and progress.
  一、在開工前負(fù)責(zé)進(jìn)行:
  1、 Be responsible for the following before the commencement of Construction:
  1)原材料的驗(yàn)證試驗(yàn)、配合比設(shè)計(jì)等標(biāo)準(zhǔn)試驗(yàn)及定線等測(cè)量工作;2)特殊材料或工藝的試驗(yàn)、研究、論證及報(bào)批;3)施工準(zhǔn)備情況的自檢;4)開工報(bào)告完成及報(bào)批。
  1) Standard tests such as raw material verification test, mix proportion design and other standard tests and alignment survey work; 2) test, research, demonstration and approval of special materials or processes; 3) self inspection of construction preparation; 4) completion and approval of commencement report.
  二、在施工過(guò)程中負(fù)責(zé)進(jìn)行:
  2、 During the construction process, it is responsible for:
  1.進(jìn)行工序及工藝過(guò)程的試驗(yàn)檢測(cè)控制。糾正不良操作方法,改進(jìn)和提高落后的工藝水平,控制工程的質(zhì)量標(biāo)準(zhǔn)。
  1. Test and control the process and process. Correct the bad operation method, improve and improve the backward technology level, and control the quality standard of the project.
  2.記錄整理施工原始記錄。
  2. Record and sort out the original construction records.
                冷再生機(jī)租賃
  3.對(duì)完工的分項(xiàng)工程或部位進(jìn)行自檢評(píng)定,形成自檢記錄,對(duì)自檢合格的工程提交轉(zhuǎn)序申請(qǐng)報(bào)告。
  3. Carry out self inspection and evaluation for completed sub projects or parts, form self inspection records, and submit application report for sequence transfer of qualified projects.
  4.對(duì)工程施工過(guò)程中出現(xiàn)的各種影響施工和工程質(zhì)量的情況、問(wèn)題,及時(shí)進(jìn)行協(xié)調(diào)、改正和處理。
  4. Timely coordinate, correct and deal with various situations and problems that affect the construction and project quality during the construction process.
  5.對(duì)工程中出現(xiàn)的質(zhì)量事故負(fù)責(zé)按規(guī)定的程序和要求進(jìn)行報(bào)告處理。
  5. Report and handle the quality accidents in the project according to the specified procedures and requirements.
  6.負(fù)責(zé)落實(shí)有關(guān)方面關(guān)于工程施工及質(zhì)量的要求或指令。
  6. Be responsible for implementing the requirements or instructions of relevant parties on project construction and quality.
  三、工程竣工后負(fù)責(zé)進(jìn)行:
  3、 After the completion of the project, be responsible for:
  1.對(duì)工程進(jìn)行自檢評(píng)定工作。
  1. Carry out self inspection and evaluation for the project.
  2.整理竣工資料。
  2. Sort out the completion data.
  3.完成竣工報(bào)告。
  3. Complete the completion report.
  4.負(fù)責(zé)工程質(zhì)量責(zé)任期內(nèi)的質(zhì)量問(wèn)題處理。
  4. Be responsible for the treatment of quality problems within the project quality responsibility period.
  5.和有關(guān)部門對(duì)工程進(jìn)行交(竣)工工程質(zhì)量鑒定和工程驗(yàn)收工作。
  5. Carry out quality appraisal and acceptance of the project with relevant departments.